Foundation Design & Pile Installation

Foundation Design & Pile Installation

The scope of work:

  • Design pile foundation for new concrete slab based on geotechnical investigation report.
  • Design new slab with re-bar and pile foundation.
  • Saw cut, demolish and remove the existing concrete from the site for re-cycling.
  • Supply and install piles and piles caps as per design drawings prepared and stamped by Onemechman Ltd.
  • Supply and install all materials (concrete, re-bar, forms, and other required materials), tools, equipment, labours and logistics to build a new concrete pad inside FD & B feed building as per the new design drawings prepared and stamped by OMN Ltd.
  • Remove forms and clean all related debris off site.
  • Construction monitoring, material testing for compaction and concrete test.
  • Construction management

Item of Work

  1. Foundation Design
  2. Saw cut, Demolition and removal of existing damaged slab
  3. Pile installation
  4. Form work and re-bar preparation
  5. Concrete pour
  6. Form work removal and clean up