Foundation Design & Pile Installation
The scope of work:
- Design pile foundation for new concrete slab based on geotechnical investigation report.
- Design new slab with re-bar and pile foundation.
- Saw cut, demolish and remove the existing concrete from the site for re-cycling.
- Supply and install piles and piles caps as per design drawings prepared and stamped by Onemechman Ltd.
- Supply and install all materials (concrete, re-bar, forms, and other required materials), tools, equipment, labours and logistics to build a new concrete pad inside FD & B feed building as per the new design drawings prepared and stamped by OMN Ltd.
- Remove forms and clean all related debris off site.
- Construction monitoring, material testing for compaction and concrete test.
- Construction management
Item of Work
- Foundation Design
- Saw cut, Demolition and removal of existing damaged slab
- Pile installation
- Form work and re-bar preparation
- Concrete pour
- Form work removal and clean up